Case Study:
Managing Connector Obsolescence

Component obsolescence can strike at any time. When it does happen, an unplanned redesign and requalification is rarely possible.  Atrenne Integrated Solutions understands the pressure of delivering products while efficiently managing the life cycle of each component on a bill-of-material.  Atrenne recently helped a technology integrator who found themselves at risk of being unable to fulfill production orders because one of the critical connector components went end-of-life (EOL). We worked closely with the integrator to reverse engineer the component, design and build tooling, test and qualify, and ultimately delivered a drop-in replacement for the connector that enabled production to move forward.